VANCOUVER, BC, Nov. 6, 2025 /CNW/ – Silvercorp Metals Inc. (“Silvercorp” or the “Company”) (TSX: SVM) (NYSE American: SVM) reported its financial and operating results for the three months ended September 30, 2025 (“Q2 Fiscal 2026”). All amounts are expressed in US dollars, and figures may not add due to rounding.
HIGHLIGHTS FOR Q2 FISCAL 2026
- Produced approximately 1.66 million ounces of silver, 2,085 ounces of gold, or approximately 1.84 million ounces of silver equivalent1, 14.23 million pounds of lead and 5.64 million pounds of zinc;
- Sold approximately 1.66 million ounces of silver, 2,033 ounces of gold, 14.75 million pounds of lead, and 5.67 million pounds of zinc, for revenue of $83.3 million, an increase of 23% over the three months ended September 30, 2024 (“Q2 Fiscal 2025”);
- All-in sustaining cost (“AISC”) per ounce of silver, net of by-product credits, of $13.94;
- Net loss attributable to equity shareholders of $11.5 million, or $0.05 per share, mainly due to a $53.2 million non-cash charge on “mark to market” of the fair value of convertible notes;
- Adjusted net income attributable to equity shareholders of $22.6 million, or $0.10 per share, after excluding the $53.2 million non-cash charge, a $21.6 million gain on investments, and other non-cash or one-time items;
- Adjusted earnings before interest, income tax, depreciation and amortization (“EBITDA”) attributable to equity shareholders of $38.3 million, or $0.18 per share;
- Generated cash flow from operating activities of $39.2 million, and free cash flow of $11.4 million;
- Spent and capitalized $15.8 million on exploration, development, and equipment and facilities at the China operations;
- Spent and capitalized $10.9 million at the Ecuador operations for the development and construction of the El Domo mine and permitting activities for the Condor project;
- Ended the period with cash and cash equivalents and short-term investments of $382.3 million, an increase of $5.1 million from the previous quarter, and a portfolio of equity investments with a total market value of $180.2 million, an increase of $108.0 million from the previous quarter; and
- Subsequent to quarter end, drew down the first $43.875 million from Wheaton Precious Metals International Ltd. under the $175.5 million stream financing agreement for the El Domo mine construction.
|
______________________ |
|
|
CONSOLIDATED FINANCIAL RESULTS
Revenue in Q2 Fiscal 2026 was $83.3 million, up 23% compared to $68.0 million in Q2 Fiscal 2025, mainly due to increases of 28% and 37% in the selling prices for silver and gold respectively ($13.1 million of increased revenue), coupled with 1% more silver and 64% more gold produced and sold ($2.9 million of increased revenue).
Income from mine operations in Q2 Fiscal 2026 was $40.9 million, up 29% compared to $31.7 million in Q2 Fiscal 2025, mainly due to the increase in revenue mentioned above, partially offset by an increase of $3.9 million in production costs due to 15% more ore processed this quarter and an increase of $1.4 million in mineral rights royalties, which was implemented in China in the third quarter of Fiscal 2025.
Net loss attri
butable to equity shareholders of the Company in Q2 Fiscal 2026 was $11.5 million or $0.05 per share, compared to net income of $17.7 million or $0.09 per share in Q2 Fiscal 2025, which was mainly due to the impact of a $53.2 million non-cash charge on “mark to market” of the fair value of convertible notes.
The adjusted net income attributable to equity shareholders of the Company was $22.6 million or $0.10 per share, after excluding the $53.2 million non-cash charge, a $21.6 million gain on mark to market investments, and $2.5 million non-cash or one-time expenses, compared to $17.8 million or $0.09 per share in Q2 Fiscal 2025.
The adjusted EBITDA attributable to equity shareholders of the Company was $38.3 million or $0.18 per share compared to $29.3 million or $0.14 per share in Q2 Fiscal 2025.
Cash flow provided by operating activities in Q2 Fiscal 2026 was $39.2 million, up $16.1 million compared to $23.1 million in Q2 Fiscal 2025.
Free cash flow in Q2 Fiscal 2026 was $11.4 million, up $10.8 million compared to $0.6 million in Q2 Fiscal 2025 after the Company spent $9.0 million in Ecuador to advance construction at the El Domo Project and permitting activities for the Condor Project.
Cash, cash equivalents and short term investments at the end of the quarter were $382.3 million, up $5.1 million compared to $377.1 million as at June 30, 2025. The total market value of equity investments was $180.2 million as at September 30, 2025, an increase of $108.0 million from the previous quarter.
CONSOLIDATED FINANCIAL AND OPERATING RESULTS
|
|
|
|
|
||||
|
|
|
2024 |
|
|
|
2024 |
|
|
|
|
|
|
|
|
|
|
|
|
|
$ 68,003 |
|
|
|
$ 140,168 |
|
|
|
|
31,661 |
|
|
|
68,175 |
|
|
|
|
17,707 |
|
|
|
39,645 |
|
|
|
|
0.090 |
|
|
|
0.210 |
|
|
|
|
17,761 |
|
|
|
38,379 |
|
|
|
|
0.09 |
|
|
|
0.20 |
|
|
|
|
29,124 |
|
|
|
63,476 |
|
|
|
|
0.14 |
|
|
|
0.33 |
|
|
|
|
29,293 |
|
|
|
62,325 |
|
|
|
|
0.14 |
|
|
|
0.3269 |
|
|
|
|
23,128 |
|
|
|
63,083 |
|
|
|
|
22,566 |
|
|
|
38,951 |
|
|
|
|
562 |
|
|
|
24,132 |
|
|
|
|
203,532,135 |
|
|
|
190,625,815 |
|
|
|
|
|
|
|
|
|
|
|
|
|
1.64 |
|
|
|
3.38 |
|
|
|
|
1,239 |
|
|
|
2,237 |
|
|
|
|
13.26 |
|
|
|
28.92 |
|
|
|
|
5.89 |
|
|
|
12.38 |
|
|
|
|
|
|
|
|
|
|
|
|
|
26.49 |
|
|
|
26.41 |
|
|
|
|
2,178 |
|
|
|
2,094 |
|
|
|
|
1.00 |
|
|
|
1.00 |
|
|
|
|
1.13 |
|
|
|
1.08 |
|
|
|
|
|
|
|
|
|
|
|
|
|
(0.73) |
|
|
|
(1.21) |
|
|
|
|
11.66 |
|
|
|
10.72 |
28 % |
|
|
|
June 30, |
|
|
|
March 31, |
|
|
|
|
$ 377,133 |
|
|
|
369,056 |
|
|
|
|
309,000 |
|
|
|
310,359 |
|
CONSOLIDATED OPERATIONAL RESULTS
In Q2 Fiscal 2026, the company produced approximately 1.7 million ounces of silver, 2,085 ounces of gold, or approximately 1.8 million ounces of silver equivalent, 14.2 million pounds of lead and 5.6 million pounds of zinc, representing increases of 0.2% (silver), 76% (gold), 5% (silver equivalent), and 8% (lead), and a decrease of 3% in zinc production over Q2 Fiscal 2025.
In Q2 Fiscal 2026, the consolidated production cost (“cash cost”) per ounce of silver equivalent, net of by-product credits, was $0.002, a slight increase from the negative $0.73 in Q2 Fiscal 2025, mainly due to an increase of 15% in ore production, while silver production increased by only 0.2%, resulting in a higher cash cost per ounce of silver, partially offset by an increase of $2.7 million in by-product credits. The consolidated AISC per ounce of silver, net of by-product credits, was $13.94, up 19.6% from $11.66 in Q2 Fiscal 2025, mainly due to i) an increase of $2.3 million in sustaining capital expenditures; ii) an increase of $1.4 million in mineral rights royalty, implemented by the Chinese authorities in the third quarter of Fiscal 2025; and iii) the increase in cash cost per ounce of silver, partially offset by a decrease of $1.6 million in general administrative expenses.
INDIVIDUAL MINE OPERATING PERFORMANCE
|
|
|
|
|
|||||
|
|
|
June 30, |
March 31, |
December 31, |
September 30, |
|
|
2024 |
|
|
|
|
|
|
|
|
|
|
|
|
|
252,958 |
265,199 |
255,783 |
193,423 |
|
|
406,189 |
|
|
|
30,397 |
39,025 |
21,912 |
17,075 |
|
|
25,551 |
|
|
|
283,355 |
304,224 |
277,695 |
210,498 |
|
|
431,740 |
|
|
|
|
|
|
|
|
||
|
|
|
217 |
189 |
226 |
254 |
|
|
247 |
|
|
|
2.8 |
2.9 |
2.9 |
3.0 |
|
|
3.1 |
|
|
|
0.5 |
0.5 |
0.6 |
0.6 |
|
|
0.7 |
|
|
|
|
|
|
|
|
||
|
|
|
1.5 |
1.4 |
2.1 |
1.6 |
|
|
1.6 |
|
|
|
51 |
62 |
67 |
87 |
|
|
91 |
|
|
|
0.8 |
0.7 |
0.7 |
0.9 |
|
|
1.3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
94.6 |
94.2 |
94.7 |
94.9 |
|
|
94.9 |
|
|
|
93.4 |
91.7 |
94.6 |
92.2 |
|
|
92.6 |
|
|
|
94.1 |
92.3 |
94.0 |
94.0 |
|
|
94.2 |
|
|
|
64.3 |
67.3 |
68.9 |
70.4 |
|
|
71.4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
83.08 |
84.90 |
84.92 |
92.86 |
|
|
91.65 |
|
|
|
129.83 |
120.62 |
150.87 |
146.90 |
|
|
143.51 |
|
|
|
1.26 |
3.05 |
(0.30) |
0.62 |
|
|
(0.05) |
|
|
|
10.10 |
11.35 |
11.05 |
9.05 |
|
|
8.07 |
|
|
|
|
|
|
|
|
|
|
|
|
|
1.69 |
1.56 |
1.78 |
1.52 |
|
|
3.09 |
|
|
|
2,050 |
3,110 |
2,056 |
1,183 |
|
|
2,329 |
|
|
|
1.85 |
1.85 |
1.95 |
1.61 |
|
|
3.27 |
|
|
|
14.60 |
15.56 |
15.23 |
11.97 |
|
|
26.05 |
|
|
|
1.85 |
2.04 |
2.25 |
1.80 |
|
|
4.26 |
|
|
|
|||||||
In Q2 Fiscal 2026, the Ying Mining District produced approximately 1.53 million ounces of silver, 2,085 ounces of gold, or approximately 1.71 million ounces of silver equivalent, plus 12.93 million pounds of lead, and 1.42 million pounds of zinc, representing production increases of 1% (silver), 76% (gold), 6% (silver equivalent), and 8% (lead), and a decrease of 21% in zinc, compared to Q2 Fiscal 2025. The production in the quarter was affected by the temporary closure of certain mining areas (refer to Silvercorp’s August 7, 2025 news release). These areas have since reopened, and production has returned to normal levels. Ore production at the Ying Mining District in the third quarter of Fiscal 2026 is expected to be approximately 346,000 tonnes, up 30% compared to Q2 Fiscal 2026.
While the consolidated production cost (“cash cost”) per ounce of silver, net of by-product credits, has increased, the cash cost per tonne of ore at the Ying Mining District decreased to $82.89 from $92.86 in Q2 Fiscal 2025. This reduction reflects a higher percentage of ore mined using the more cost-efficient and mechanized shrinkage mining method compared to the more labour intensive re-suing mining method. Shrinkage mining tends to have higher dilution rates and lower head grades.
The AISC cash cost per tonne ore also decreased to $139.22 from $146.90 in Q2 Fiscal 2025, further improving the gross profit margin.
|
|
|
|
|
|||||
|
|
|
June 30, |
March 31, |
December 31, |
September 30, |
|
|
2024 |
|
|
|
74,869 |
41,760 |
84,115 |
86,707 |
|
|
173,161 |
|
|
|
|
|
|
|
|
|
|
|
|
|
69 |
61 |
77 |
61 |
|
|
63 |
|
|
|
0.8 |
0.9 |
1.1 |
0.8 |
|
|
0.8 |
|
|
|
2.3 |
2.9 |
2.7 |
2.4 |
|
|
2.4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
85.3 |
83.7 |
82.8 |
82.2 |
|
|
83.2 |
|
|
|
90.1 |
87.4 |
90.3 |
87.9 |
|
|
89.1 |
|
|
|
90.0 |
90.3 |
90.3 |
90.2 |
|
|
90.3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
62.53 |
77.46 |
53.69 |
50.08 |
|
|
50.28 |
|
|
|
99.93 |
117.83 |
75.55 |
74.53 |
|
|
78.96 |
|
|
|
(0.80) |
(8.53) |
(19.14) |
(15.67) |
|
|
(13.85) |
|
|
|
20.02 |
15.05 |
(6.13) |
1.62 |
|
|
5.19 |
|
|
|
|
|
|
|
|
|
|
|
|
|
0.14 |
0.07 |
0.17 |
0.14 |
|
|
0.28 |
|
|
|
1.13 |
0.70 |
1.85 |
1.23 |
|
|
2.77 |
|
|
|
3.38 |
2.37 |
4.42 |
4.02 |
|
|
7.98 |
In Q2 Fiscal 2026, metals produced at the GC Mine were approximately 0.13 million ounces of silver, 1.31 million pounds of lead, and 4.22 million pounds of zinc, representing decreases of 7% (silver), 6% (lead), and 5% (zinc), compared to Q2 Fiscal 2025. Production in Q2 Fiscal 2026 was interrupted by severe rainy and typhoon weather conditions for around 10 days. Ore production at the GC Mine in the third quarter of Fiscal 2026 is expected to be approximately 83,000 tonnes, up 9% compared to Q2 Fiscal 2026.
Production costs per tonne at the GC Mine were within the Fiscal 2026 Guidance, but increased from $50.08 (Q2 Fiscal 2025) to $58.20 (Q2 Fiscal 2026), due to lower ore production.
CAPITAL EXPENDITURES AND DEVELOPMENT FOR GROWTH
Total capital expenditures in Q2 Fiscal 2026 were $26.7 million, down 5% compared to $28.1 million in Q2 Fiscal 2025.
For the Ying Mining District, capitalized expenditures for underground tunnels and drilling amounted to $12.4 million, plus $0.8 million for plant and equipment, for a total of $13.2 million in Q2 Fiscal 2026, compared to capitalized expenditures for underground tunnels of $13.6 million, plus $9.5 million for plant and equipment (total $23.1 million) in Q2 Fiscal 2025, when the Mill No. 2 expansion and TSF No. 3 were under construction.
For the Kuanping project under construction, $1.2 million of capital expenditures were incurred in Q2 Fiscal 2026, focusing on underground development.
The total capitalized expenditures at the GC Mine remained flat compared to Q2 Fiscal 2025 at around $1.4 million.
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ying Mining District |
8,879 |
$ 6,122 |
12,639 |
$ 5,271 |
34,767 |
$ 977 |
$ 822 |
$ 13,191 |
12,897 |
29,564 |
|
GC Mine |
1,323 |
605 |
1,799 |
673 |
4,509 |
98 |
36 |
1,412 |
2,958 |
8,667 |
|
El Domo |
— |
9,941 |
— |
— |
— |
— |
265 |
10,206 |
— |
— |
|
Condor |
— |
670 |
— |
— |
251 |
42 |
— |
712 |
— |
— |
|
Kuanping & other |
831 |
736 |
613 |
221 |
— |
— |
220 |
1,178 |
— |
— |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Q2 Fiscal 2025 |
|
|
|
|
|
|
|
|
|
|
|
Ying Mining District |
4,589 |
$ 5,841 |
17,440 |
$ 7,445 |
8,843 |
$ 336 |
$ 9,487 |
$ 23,109 |
23,008 |
52,136 |
|
GC Mine |
154 |
4 |
2,743 |
1,308 |
9,649 |
210 |
69 |
1,591 |
2,642 |
4,659 |
|
El Domo |
— |
— |
— |
— |
— |
2,533 |
— |
2,533 |
— |
— |
|
Condor |
— |
— |
— |
— |
— |
569 |
— |
569 |
— |
— |
|
Kuanping & other |
— |
— |
— |
— |
— |
249 |
8 |
257 |
— |
— |
|
Consolidated |
4,743 |
5,845 |
20,183 |
8,753 |
18,492 |
3,897 |
9,564 |
28,059 |
25,650 |
56,795 |
The El Domo mine construction advanced significantly in Q2 Fiscal 2026. Approximately 1.29 million cubic metres of material were cut for site preparation, roads and channel construction, representing a 249% increase over the last quarter. A 481-bed construction camp was completed, and the construction for the tailing storage facility (TSF) began in September 2025. Since January 2025, approximately 1.66 million cubic metres of material were cut and $18.9 million were spent on capital expenditures and prepayments for equipment purchases.
The construction contracts for the external power line have been awarded to Ecuadorian qualified contractors, subject to review by Corporation Nacional de Electricidad (“CNEL”). Equipment orders totaling approximately $22.2 million have been placed.
For the Condor Project, a preliminary economic assessment (PEA) study was initiated in Q2 Fiscal 2026 to be completed in the third quarter of Fiscal 2026.
CONFERENCE CALL DETAILS
A conference call to discuss these results will be held on Friday, November 7, at 9:00 am PDT (12:00 pm EDT). To participate in the conference call, please dial the numbers below.
Canada/USA TF: 888-510-2154
China Toll: 861087833254
International/Local Toll: 437-900-0527
Conference ID: 16132
Participants should dial-in 10 – 15 minutes prior to the start time. A replay of the conference call and transcript will be available on the Company’s website at www.silvercorpmetals.com.
Mr. Guoliang Ma, P.Geo., Manager of Exploration and Resources of the Company, is the Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and has reviewed and given consent to the technical information contained in this news release.
About Silvercorp
Silvercorp is a Canadian mining company producing silver, gold, lead, and zinc with a long history of profitability and growth potential. The Company’s strategy is to create shareholder value by 1) focusing on generating free cash flow from long life mines; 2) organic growth through extensive drilling for discovery; 3) ongoing merger and acquisition efforts to unlock value; and 4) long term commitment to responsible mining and ESG. For more information, please visit our website at www.silvercorpmetals.com.
For further information
Silvercorp Metals Inc.
Lon Shaver
President
Phone: (604) 669-9397
Toll Free 1(888) 224-1881
Email: investor@silvercorp.ca
Website: www.silvercorpmetals.com
ALTERNATIVE PERFORMANCE (NON-GAAP) MEASURES
This news release should be read in conjunction with the Company’s Management Discussion & Analysis (“MD&A”), the unaudited consolidated condensed interim financial statements and related notes contains therein for the three and six months ended September 30, 2025, which have been posted on SEDAR+ under the Company’s profile at www.sedarplus.ca and on EDGAR at www.sec.gov, and are also available on the Company’s website at www.silvercorpmetals.com under the Investor section. This news release refers to various alternative performance (non-IFRS) measures, such as adjusted earnings and adjusted earnings per share, EBITDA and EBITDA per share, adjusted EBITDA and adjusted EBITDA per share, free cash flow, cash cost and all-in sustaining cost per ounce of silver, net of by-product credits, cash cost and AISC per tonne of ore processed, silver equivalent, and working capital. The tonnage of ore production refers to wet tonne, containing approximately 2% to 3% moisture. These measures are widely used in the mining industry as a benchmark for performance, but do not have standardized meanings under IFRS as an indicator of performance and may differ from methods used by other companies with similar description. The detailed description and reconciliation of these alternative performance (non-GAAP) measures have been incorporated by reference and can be found under section 12 – Alternative Performance (Non-GAAP) Measures in the MD&A for the three and six months ended September 30, 2025 filled on SEDAR+ at www.sedarplus.ca and EDGAR at www.sec.gov and which is incorporated by reference here in.
CAUTIONARY DISCLAIMER – FORWARD-LOOKING STATEMENTS
This news release includes “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable securities laws relating to, among other things statements the accuracy of mineral resource and mineral reserve estimates at the Company’s material properties; estimates of the Company’s revenues and capital expenditures; estimated production from the Company’s mines in the Ying Mining District and the GC Mine; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company’s operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company’s properties; timing of the completion of the underground mining pre-feasibility study for the Condor Project, estimated El Domo and Kuanping mine construction progress, and timing of development ore from the Kuanping project to be available for processing. By their very nature, forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause our actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking information may in some cases be identified by words such as “will”, “anticipates”, “expects”, “intends” and similar expressions suggesting future events or future performance.
We caution that all forward-looking information is inherently subject to change and uncertainty and that actual results may differ materially from those expressed or implied by the forward-looking information. A number of risks, uncertainties and other factors, including fluctuating commodity prices; recent market events and condition; estimation of mineral resources, mineral reserves and mineralization and metal recovery; interpretations and assumptions of mineral resource and mineral reserve estimates; exploration and development programs; climate change; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of future production; integration of future acquisitions into existing operations; permits and licences for mining and exploration in China; title to properties; non-controlling interest shareholders; acquisition of commercially mineable mineral rights; financing; competition; operations and political conditions; regulatory environment in China; regulatory environment and political climate in Bolivia and Ecuador; integration and operations of Adventus; environmental risks; natural disasters; dependence on management and key personnel; foreign exchange rate fluctuations; insurance; risks and hazards of mining operations; conflicts of interest; internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act; outcome of current or future litigation or regulatory actions; bringing actions and enforcing judgments under U.S. securities laws; cyber-security risks; public health crises; the Company’s investment in New Pacific Metals Corp. and Tincorp Metals Inc.; and the other risk factors described in the Company’s Annual Information Form and filed with the U.S. Securities and Exchange Commission as part of the Company’s Form 40-F and other filings with Canadian and U.S. regulators on www.sedarplus.ca and www.sec.gov; could cause actual results and events to differ materially from those expressed or implied in the forward-looking information or could cause our current objectives, strategies and intentions to change. Accordingly, we warn investors to exercise caution when considering statements containing forward-looking information and that it would be unreasonable to rely on such statements as creating legal rights regarding our future results or plans. We cannot guarantee that any forward-looking information will materialize and you are cautioned not to place undue reliance on this forward-looking information. Any forward-looking information contained in this news release represents expectations as of the date of this news release and is subject to change after such date. However, we are under no obligation (and we expressly disclaim any such obligation) to update or alter any statements containing forward-looking information, the factors or assumptions underlying them, whether as a result of added information, future events or otherwise, except as required by law. All of the forward-looking information in this news release is qualified by the cautionary statements herein.
A comprehensive discussion of other risks that impact Silvercorp can also be found in its public reports and filings under the Company’s profile on SEDAR+ at www.sedarplus.ca, on EDGAR at www.sec.gov, and on the Company’s website at www.silvercorp.ca.
Cautionary Note to United States Investors Concerning Estimates of Reserves and Resources
Reserve and resource estimates included in this news release have been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy, and Petroleum Definition Standards on Mineral Resources and Mineral Reserves. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for public disclosure by a Canadian company of scientific and technical information concerning mineral projects. Unless otherwise indicated, all mineral reserve and mineral resource estimates contained in the technical disclosure have been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards on Mineral Resources and Reserves. Canadian standards, including NI 43-101, differ significantly from the requirements of the Securities and Exchange Commission, and mineral reserve and resource information included in this news release may not be comparable to similar information disclosed by U.S. companies.