Nevada Sunrise Announces Fall 2025 Exploration Plans for the Griffon Gold Mine Project, Nevada

Tuesday at 8:30am ADT · October 14, 2025 8 min read

Vancouver, British Columbia–(Newsfile Corp. – October 14, 2025) – Nevada Sunrise Metals Corporation (TSXV: NEV) (OTC Pink: NVSGF) (“Nevada Sunrise” or the “Company”) is pleased to announce its exploration plans for the fall of 2025 at the Griffon Gold Mine Project (“Griffon“, or the “Project“) in White Pine County, Nevada, USA. Griffon hosts a past-producing gold mine, and is located within the Battle Mountain-Eureka Gold Belt, a fertile trend that contains numerous gold mines and deposits.

Highlights of the Fall 2025 Exploration Program

In the Second Quarter of 2025, Nevada Sunrise received positive results from AI-generated analysis by VRIFY Technology Inc. (“VRIFY”) of the extensive historical Griffon geological and geophysical database (see Nevada Sunrise news release dated September 9, 2025). The Fall 2025 surface work will initially cover the unmined area south of the Hammer Ridge open pit (the “Anvil Zone”) to help define a potential “signature” from a known gold occurrence, and allow comparisons to the work carried out on the high priority target areas defined by VRIFY. The 2025 Fall exploration program includes:

  • Comprehensive soil surveys incorporating leading-edge geochemical technology, i.e., Soil Gas Hydrocarbon (“SGH”) and/or Ionic Leach methods, which can detect subtle indications of buried mineralization that may not show robust surface expression from conventional soil surveys;
  • Ground geophysical surveys consisting of induced polarization/resistivity (“IP/Resistivity”) and/or controlled source audio-frequency magnetotellurics (“CSAMT”) methods to better identify the character of the geological structures present at Griffon;
  • Multi-element geochemical analysis of reverse circulation drill cuttings collected at Griffon by Fremont Gold Corp. in 2020, which were historically assayed only for gold despite the presence of strong alteration in the deeper Pilot Shale member, e.g., hole GF20-07B (see Figure 1). The broader analytical package includes antimony, arsenic, thallium, mercury and other important pathfinder elements that could provide geochemical vectors for new drill targets at the Project.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2799/270313_nevada_550.jpg

Figure 1: Strong alteration of the Pilot Shale in Hole GF20-7B drilled by Fremont Gold (2020)

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2799/270313_nevada.jpg

“Our recent work at Griffon confirms the Company’s belief that since the early closure of the open pit mining operation in 1999, sporadic exploration carried out over the last 26 years has only scratched the surface of the Project,” said Warren Stanyer, President and CEO of Nevada Sunrise. “New discoveries of gold, both in near-surface deposits and at greater depths, are becoming more frequent in Nevada due to the growing geological knowledge base and the application of modern technologies, which Nevada Sunrise’s exploration team is pleased to embrace.”

Griffon Permitting Update

In late September 2025, Nevada Sunrise submitted a Plan of Operations (the “Plan“) for Griffon to the United States Forest Service (the “USFS“) to advise the USFS of the Company’s proposed surface disturbance and drilling plans at Griffon. The USGS has confirmed its receipt of the Plan and the Company awaits comments within a standard 30-day period from receipt. However, it is unknown at this time how the current U.S. government shutdown will affect the usual response time from the USFS.

About Griffon

Griffon is located approximately 50 kilometres (33 miles) southwest of Ely, Nevada and consists of 89 unpatented mineral claims totaling approximately 1,780 acres (720 hectares). Griffon is situated within a 60 kilometre (40 mile) section of the Battle Mountain-Eureka Belt, which hosts operating gold mines and significant gold deposits (see Figure 2).

In February 2025, the Company entered into a mining lease to purchase Griffon from an arm’s-length party (see Nevada Sunrise news release dated February 20, 2025). Gold was mined at Griffon in two open pits from 1998 to 1999 and was reported to have produced 62,661 ounces of oxide gold until its premature closure in 1999, a year when the price of gold averaged approximately US$278 per ounce.1

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2799/270313_nevada2_550.jpg

Figure 2: Griffon’s Location in the Battle Mountain-Eureka Gold Belt

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2799/270313_nevada2.jpg

For more information about Griffon, including maps and photos, visit the Company’s website at: www.nevadasunrise.ca.

References:

1 Nevada Division of Minerals, “Major Mines of Nevada”, published 1998 and 1999.

Qualified Person

The scientific and technical information contained in this news release has been reviewed and approved by Robert Allender Jr, CPG, SME and a Qualified Person for Nevada Sunrise as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Mr. Allender has examined information regarding the historical and proposed exploration at Griffon, which includes his review of the historical sampling, analytical procedures and results underlying the information and opinions contained herein.

Management cautions that historical results were collected and reported by operators unrelated to Nevada Sunrise and have not been verified nor confirmed by its Qualified Person; however, the historical results create a scientific basis for ongoing work at the Griffon property. Management further cautions that historical results, discoveries and published resource estimates on adjacent or nearby mineral properties, whether in stated current resource estimates or historical resource estimates, are not necessarily indicative of the results that may be achieved on the Griffon property.

About Nevada Sunrise

Nevada Sunrise is a junior mineral exploration company with a strong technical team based in Vancouver, BC, Canada, that holds interests in gold, copper and lithium exploration projects located in the State of Nevada, USA.

Nevada Sunrise holds the right to purchase a 100% interest in the Griffon Gold Mine Project, located approximately 50 kilometers (33 miles) southwest of Ely, NV.

Nevada Sunrise holds the right to earn a 100% interest in the Coronado Copper Project, located approximately 48 kilometers (30 miles) southeast of Winnemucca, NV.

Nevada Sunrise owns 100% interests in the Gemini West, Jackson Wash and Badlands lithium projects, all of which are located in the Lida Valley in Esmeralda County, NV.

As a complement to its exploration projects in Esmeralda County, the Company owns Nevada Water Right Permit 86863, also located in the Lida Valley basin, near Lida, NV.

For Further Information, Contact:
Warren Stanyer, President and Chief Executive Officer
email: warrrenstanyer@nevadasunrise.ca Telephone: (604) 428-8028
Website: www.nevadasunrise.ca

FORWARD-LOOKING STATEMENTS

This release may contain forward‐looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects”, “plans”, “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential” and similar expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur and include disclosure of anticipated exploration activities. Although the Company believes the expectations expressed in such forward‐looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward‐looking statements are based on the beliefs, estimates and opinions of the Company’s management on the date such statements were made. The Company expressly disclaims any intention or obligation to update or revise any forward‐looking statements whether as a result of new information, future events or otherwise.

Such factors include, among others, risks related to: the results of the VRIFY study seeking new target areas at Griffon; the ability of the Company to raise funds for exploration activities, permitting and property maintenance costs at Griffon; reliance on technical information provided by third parties on any of our exploration properties; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; labor disputes and other risks of the mining industry; delays due to pandemic; delays due to weather events; delays in obtaining governmental approvals, financing or in the completion of exploration, as well as those factors discussed in the section entitled “Risk Factors” in the Company’s Management Discussion and Analysis for the Nine Months ending June 30, 2025, which is available under Company’s SEDAR+ profile at: www.sedarplus.ca

Although Nevada Sunrise has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Nevada Sunrise disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise. Accordingly, readers should not place undue reliance on forward-looking information.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/270313

displaying rededs